    2, to determine the pore size of the channel. Common channel in the manifold,

the pressure hole P back hole T vent hole L and four mounting holes. Pressure hole
is determined by the hydraulic pump flow back to the hole is generally not less than

the pressure hole. Directly connected with the hydraulic components, hydraulic hole

is determined by the selected hydraulic component requirements. The connection hydraulic hose machine

between the hole and the hole hole plug in the manifold block surface blocked.
Connection with the hydraulic tubing hydraulic hole can be a fine thread metric or

inch pipe thread.
    3, hydraulic components on the manifold block layout. A good production of

hydraulic components model on the Manifold each view layout, and some hydraulichydraulic hose clamps

components need connecting plate, the model should prevail in connecting plate.
The solenoid valve shall be arranged before the manifold block to avoid

electromagnetic valve at both ends of the electromagnet collide with other parts of

the back. Hydraulic components should be arranged to the processing of the hole in braided hose fittings

the manifold at least as well. As shown, the channels connected to hydraulic

components arranged in the same horizontal plane as much as possible or within the

scope of the diameter d, otherwise they will be drilled perpendicular to the middle

hole, blocked pores between the minimum wall thickness h must be a strength check
Hydraulic components in the horizontal plane of the channel connected with the

public hole, should be arranged to be drilled in the same vertical position or the

diameter d range, otherwise the middle channels, about the connection of the pore

before and after the Manifold should be perpendicular to each other, or have to

Drill the middle channel. Design Manifold, pay attention to their height should be

higher than the maximum lateral size of the hydraulic components mounted on 2mm, to

avoid the integration of components in the upper and lower manifold collide, the

impact Manifold fastening.
    4, Manifold hydraulic components layout program. Electromagnetic valve arranged

in the front and rear of the manifold block, the first arrangement of the vertical

position, after the arrangement of the horizontal position, to avoid the fixed screw

of the electromagnetic valve and the valve port channel, Manifold fixed screw the

same. Hydraulic components leak hole can be considered a merger with back hole. The

horizontal position of the channel can be divided into three floors of the layout.

According to the need for the level of pore layout, hydraulic components can be up

and down and move around for some distance. The pilot valve part of the relief valve

can reach out to the manifold block, and some original horizontal layout.